Shared hosting is a fine place to start. Then the app grows: queues, scheduled jobs, more traffic, a mobile app hitting the API. Shared hosting starts saying no, and every deployment becomes a nervous FTP upload.
When I deployed the TWG Platform to production, I containerized the whole stack with Docker. It's now how I set up most new projects, and how I move older ones. Here's the plan I follow.
Why Docker
- The same setup everywhere. What runs on my laptop runs on staging and production.
- Easier upgrades. Changing PHP or Node versions becomes a one-line change you can test, not a server-wide gamble.
- Clear pieces. Web app, queue workers, scheduler, database and cache each run as their own service.
Docker isn't required for a good server. But for teams that will keep changing the app, it removes a lot of "works on my machine" pain.
Step 1: Containerize and run it locally
I write a Dockerfile for the app and a docker-compose.yml for the services around it: Nginx, PHP-FPM or Node, queue workers, a scheduler, Redis and the database for local use. The goal of this step is simple: the app runs locally exactly as it will in production.
Step 2: Build the new server next to the old one
On DigitalOcean (or AWS), I create a fresh Ubuntu server, harden it (SSH keys only, firewall, automatic security updates), install Docker and deploy the app. For production databases I usually prefer a managed database, so backups and updates aren't my client's problem.
Nothing changes for users yet. The old server keeps serving everyone.
Step 3: Copy the data and test
- Copy the database and uploaded files to the new server.
- Point a temporary subdomain at it and test every main flow.
- Check emails, scheduled jobs, payment webhooks and file uploads. These are the things most often forgotten.
Step 4: Plan the DNS switch
A day or two before the move, I lower the DNS TTL to a few minutes so the switch spreads quickly. On the day:
- Put the old site in maintenance mode for a few minutes.
- Take a final database copy and load it on the new server.
- Switch the DNS records.
- Issue the SSL certificate and confirm HTTPS works.
- Turn maintenance mode off.
For most apps, users see a few minutes of maintenance at most.
Step 5: Keep the old server for a week
Don't cancel the old hosting on day one. Keep it for a week, untouched, as a fallback. Once the new server has run cleanly through a week of real traffic, backups and scheduled jobs, it's safe to retire.
After the move
- Automated daily database backups stored off the server, with a restore you've actually tested.
- Uptime monitoring and error alerts.
- A deployment pipeline, so releases are a button or a
git push, not an FTP upload.